Get a Quote
Powder Coated Metal Cabinet

Model |

Powder Coated Metal Cabinet

Category |

Sheet Metal Fabrication
More
Goods Detail

Heavy Duty Large Sheet Metal Fabrication Service: Powder Coated Metal Cabinet for Display OEM ODM Fabrication Job Work


Features:

1. High quality heavy duty sheet metal fabrication, metal cabinet for tv display/ terminal box, control cabinet/ electrical cabinet

2. Tight tolerance, competitive price, nice appearance

3. Bespoke product as per customer's requirement

4. Speedy delivery


Applications:

Gaming Arcade/ Catering Equipment/ Beverage Equipment/ Electrical Cabinet/ Storage Cabinet/ Gaming Arcade/ Recycling Machine/ Display Enclosure/ Ventilation Equipment Enclosure/ Waterproof Cabinet/ Air Drying Equipment/ Coffee Machine/ Working Table/ Baking Equipment


Product Parameters:


●Raw Material: Stainless Steel, CRS, Aluminum, Galvanized Steel, Alloy, Brass, SGCC, SECC, etc.


●Spec: Roll material thickness 0.05-10mm; sheet metal thickness is 0.3-20mm.


●Surface Treatment: Black coating /Painting/ Power coating/ Gold/ Silver/ Tin/ Nickel/ Chromium/ Copper-platting/ Laser etching/Silk screening/ Electrophoresis/ Passivating/ Deburring/ Polishing/ Brush according to ROHS standard.


●Application: All kinds of arcade and gaming enclosures, kiosk, equipment case, electrical cabinet, display housing, food and beverage machinery enclosure, storage cabinet, file cabinet, etc.


●Quotation: Please provide the drawings (normally at DWG/STP/PDF file ), and specifications with material/QTY/surface treatment and other requirements, we will provide precise quotation at our earliest.


●Prototype and Mould: Prototypes or molds would be made according to the drawings that confirmed by both of us and customers. Lead time depends on the structure and qty of item, normally, lead time for prototype would take 10-20 days; lead time for mould is 20-45 days.


●Production: Prior to production, samples would be arranged according to the drawings to customers for approval. Production would start when receiving customer's purchase order with confirmed delivery date and sample. Normally, lead time for production is 15-30 days.


●Packaging: Plastic bags; preserving box; reel/tape package; plastic tray; wood box; plastic pallet/ fumigated plywood pallet. Export carton or any other customized package according to the customers' requests.


Shipment:

图片1.png


We've been specializing in sheet metal fabrication, deep drawing press parts, CNC machining, metal wireworks for over 13 years. With rich experience in producing OEM products, we've been a reliable supplier in providing precision part, fittings and accessories, beverage and food equipment enclosure, etc.


If you would be interested in any of our production, please don't hesitate to send specific enquiries for our quotation.



Copyright © Huiye Hardware & Electrical Equipment Company Ltd  

Technical Support: